Anhui Tiankang Group supplied a complete AC high-voltage cable package for the Philippines Terra Phase 1 West 1.4GWp Solar + 3.3GWh Battery Energy Storage EPC Project, including 35kV power cables with large conductor cross-sections and a comprehensive cable ampacity test report prepared in accordance with applicable IEC requirements.
| Item | Details |
|---|---|
| Project | Philippines Terra Phase 1 West 1.4GWp Solar + 3.3GWh BESS EPC Project |
| Project Type | Utility-Scale Solar PV + Battery Energy Storage (EPC) |
| Country | Philippines |
| Project Location | Western Section, Philippines |
| EPC Contractor | China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd. (GEDI) |
| Application | AC High-Voltage (35kV) Collection System, Power Distribution |
| Industry | Renewable Energy / Solar Power / Energy Storage |
| Scope of Supply | 35kV Power Cables, Cable Ampacity Test Report |
| Supply Value | RMB 74,685,660 (approx. USD 10.3 million) |
| Contract Date | April 2025 |
| Project Status | Under Execution |
| Documentation | Datasheets / Test Reports / MTC / EPC Documentation |
The Philippines Terra Phase 1 West Project combines 1.4GWp of solar photovoltaic generation with 3.3GWh of battery energy storage, requiring a large-scale medium-voltage AC collection and power distribution system.
China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd. (GEDI) serves as the EPC contractor for the project.
Anhui Tiankang Group was selected as the supplier for AC high-voltage cable Package 2, providing 35kV power cables with large conductor cross-sections together with a detailed cable ampacity test report. The contract value exceeded RMB 74.6 million (approximately USD 10.3 million), with deliveries scheduled from May to June 2025.
The project required an extensive 35kV AC collection system for collecting and distributing power generated by the solar PV facilities. The cable system needed to accommodate the project's high current requirements across a large-scale renewable energy installation.
The project required 35kV cables with conductor cross-sections of 400 mm², 500 mm², and 630 mm². These large cross-section cables require appropriate manufacturing capacity, process control, quality inspection, and handling during production and shipment.
The project required a comprehensive cable ampacity test report based on applicable IEC requirements, covering current-carrying capacity under specified air and soil installation conditions.
The assessment included different ambient and soil temperatures, soil thermal resistivity values, and burial depth to support cable selection and ampacity evaluation for the project.
The cable package required export shipment from China to the Philippines, with delivery coordinated in three batches to match the project's construction schedule.
The project required technical and quality documentation including datasheets, factory inspection and test reports, material certificates, and other EPC project documentation.
Anhui Tiankang Group supplied a comprehensive AC high-voltage cable package for the Terra solar + storage project.
| Cable Type | Conductor | Quantity |
|---|---|---|
| ZC-YJLV62-26/35kV | 1×400 mm² | 635 km |
| ZC-YJLSV62-26/35kV | 1×500 mm² | 76.02 km |
| ZC-YJLSV62-26/35kV | 1×630 mm² | 6.61 km |
Total Cable Length: 717.63 km
A comprehensive cable ampacity test report was provided based on applicable IEC requirements, covering:
Maximum current-carrying capacity under air and soil installation conditions
Ambient temperature: 30°C
Soil temperature: 20°C
Soil thermal resistivity: 1.5 K·m/W and 2.5 K·m/W
Burial depth: 0.8 m
Bilingual Chinese/English report
Factory inspection and test reports
Technical datasheets
Material certificates
EPC project documentation
35kV power cables with 400 mm², 500 mm², and 630 mm² conductor cross-sections were supplied to meet the project's specified electrical requirements.
The cable constructions were selected according to the project specifications and applicable installation requirements for the 35kV collection system.
A detailed cable ampacity test report was prepared based on applicable IEC requirements, providing calculated current-carrying capacities for the specified installation conditions.
The report covered both air and soil installation scenarios, including different thermal resistivity values, ambient temperature, soil temperature, and burial depth. This supported the project's cable selection and ampacity assessment.
The project required 717.63 km of 35kV cables, including large conductor cross-sections up to 630 mm².
Tiankang's integrated cable manufacturing capability supported large-volume production, process control, factory inspection, and testing throughout the supply process.
Technical and quality documentation was provided to support EPC review and project documentation requirements, including datasheets, factory test reports, material certificates, inspection records, and relevant project documentation.
The cables were prepared for international shipment from China to the Philippines, with delivery scheduled in three batches of approximately 30%, 30%, and 40% according to the project delivery schedule.
Large-Scale Solar Cable Package Capability — 35kV power cables with conductor cross-sections up to 630 mm² supplied from a single manufacturer
Large-Volume Manufacturing Capability — 717.63 km of 35kV cables supplied for a single EPC project
Technical Verification & Reporting — cable ampacity assessment reports based on applicable IEC requirements
EPC Documentation Support — technical and quality documentation prepared for EPC project requirements
Export Logistics Support — export packaging, shipment coordination, and export documentation
Quality Management — manufacturing under an ISO 9001-certified quality management system
Utility-scale solar projects commonly require medium-voltage AC cables for power collection, together with low-voltage, control, communication, and auxiliary power cables depending on the project design and electrical system configuration.
Yes. Tiankang manufactures 35kV power cables with large conductor cross-sections, including 400 mm², 500 mm², 630 mm² and larger sizes, subject to project specifications and applicable product requirements.
Yes. Tiankang can prepare cable ampacity assessment reports based on applicable IEC requirements and specified installation conditions, including air and soil installation, ambient and soil temperatures, soil thermal resistivity, and burial depth.
Tiankang manufactures cable products according to applicable IEC standards, national standards, and project-specific specifications, depending on the cable type, application, and project requirements.
Whether you are developing a utility-scale solar farm, battery energy storage project, or hybrid renewable energy facility, Tiankang can support your cable procurement with manufacturing capability, technical documentation, and project-based supply coordination.
Our cable supply capabilities cover:
Utility-Scale Solar PV Plants
Battery Energy Storage Systems (BESS)
Onshore and Offshore Wind Farms
Power Transmission and Distribution
Industrial Manufacturing Facilities
Infrastructure and Utility Projects
Yin Shuangjie
International Sales Manager
📧 Email: [email protected]
📱 WhatsApp / Zalo: +86 17856068126
🌐 Website: www.tiankang-global.com